The J&P Process

Preparation

Steps 1 - 3

image238

Preparation

Step 1

The concrete is cleaned from any salt or oil residue by diamond grinding.

All grinders are hooked up to vacuums to minimize dust.

Duralast crack filler, j&coatings, duralast coatings,

Repairing the Concrete

Step 2

Duralast crack filler is used to fill pits and cracks, then ground off smooth with grinder.

image239

Basecoat

Step 3

Duralast's self priming 100% solids pure polyurea is applied to the floor.


Application

Steps 4 - 6

image240

Full Broadcasting Chips

Step 4

After an area has been base-coated, chips are thrown into the wet base-coat by hand, putting color and texture into the floor.

image241

Scraping the Floor

Step 5

After the base-coat is dry, the floor is scraped with steel blades, then vacuumed to be sure there are no loose chips on the floor.

image242

Top Coat

Step 6

The last step is to squeegee, then roll out the UV Stable Polyaspartic topcoat.